Zebra 61331M Arkusz Danych Strona 56

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 80
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 55
61335M Main Logic Board Maintenance Kit
Install the New MLB
56
61311L-001 Rev. A HC100 Maintenance Manual 5/8/08
4. Install the four mounting screws from the maintenance kit.
5.
6.
See Figure 31. Reinstall the main frame assembly onto the base by aligning the two
positioning posts with the positioning holes in the base.
Figure 31 • Reinstall the Main Frame Assembly
Important • Ensure all cable connectors are fully seated ans all connector housings are
flush against the main logic board.
See
Figure 26 on page 50. Reconnect all cable connectors.
1
Main frame assembly
2
Tabs
3
Positioning holes (2)
1
3
2
2
2
Przeglądanie stron 55
1 2 ... 51 52 53 54 55 56 57 58 59 60 61 ... 79 80

Komentarze do niniejszej Instrukcji

Brak uwag